Worship Experience
A. Present Building
- Maintain/expand plan for special needs: hearing, wheel chair access, etc.
- Create focal point visible when entering.
- Increase visibility of minister with raised platform
- Make info about banners visible again
- Build a mezzanine for the choir
- Improve flooring
- Better sound system AIV
- Windows emphasize beauty of outside — put new double pane windows on west wall and change chairs to face that wall so congregation can see the trees, etc.
- Improve R rating.
- Remodel bathrooms
B. New Sanctuary
- Separation of food prep from sanctuary(noise distraction) also separate conversation area
- Provide dedicated space for choir — practice space — piano — music storage — good acoustics — adjacent to sanctuary.
- Green sanctuary using modern tech.for energy saving
- Building planned for building on later.
- Windows to outdoors
- More, better bathrooms
- Small chapel could double as choir space, meditation space
- Large space that can be made smaller--more versatile for different size groups
- Ability to project hymns so books not needed
- Keep Doug and Roger — future — keep quality of staff
- Comfort room for babies
Coordinator: Colene
Last Update: Jun 20 2009 by MikeM